A43 Traffic Report - Heading South

A43
 
South

This Report: 25/08/2016 00:10:42

Frixo Traffic Updated: 25/08/2016 00:06:02

Road Search

Road Diagram

The diagram below shows live average speeds on the A43.

A413  56mph
M1  54mph

No Connections.

A43 Traffic Map - Travelling South


Main A43 Travel News

Clear There are currently no incidents reported on the A43 south.

Current A43 Delays - Slow Moving Traffic

Clear We have no reports of any slow moving traffic on the A43 heading south.

A43 South Average Speed Today

A43 Roadworks

Current Roadworks

* Location. The A43 southbound exit slip to the A413. Reason. Road repairs. Status. Period. From 20:02 on 8 August 2016 to 06:00 on 17 August 2016. All lanes are closed.

* Location. The A43 southbound between the A5 and the junction with the A422 Brackley (East). Reason. Road repairs. Status. Period. From 20:02 on 8 August 2016 to 06:00 on 17 August 2016. All lanes are closed.

* Location. The A43 southbound between the junctions with the A5 and the A422 Brackley East. Reason. Road repairs. Status. Period. From 20:02 on 8 August 2016 to 06:00 on 17 August 2016. All lanes are closed.

* Location. The A43 southbound between the junctions with the A413 and the A422 Brackley (East). Lane one is closed. Reason. Roadside Drains Works. Status. Period. From 20:03 on 15 August 2016 to 06:00 on 2 September 2016. There is one of two lanes closed.

* Location. The A43 southbound between the junctions with the A422 Brackley South and the A421. Lane one is closed. Reason. Roadside Drains Works. Status. Period. From 20:03 on 15 August 2016 to 06:00 on 2 September 2016. There is one of two lanes closed.

* Location. The A43 southbound between the junctions with the A422 Brackley East and the A422 Brackley South. Lane one is closed. Reason. Roadside Drains Works. Status. Period. From 20:03 on 15 August 2016 to 06:00 on 2 September 2016. There is one of two lanes closed.

* Location. The A43 southbound between the junctions with the A413 and the A422 Brackley East. Lane one is closed. Reason. Roadside Drains Works. Status. Period. From 20:03 on 15 August 2016 to 06:00 on 2 September 2016. There is one of two lanes closed.

Future Planned Roadworks

* Location. The A43 southbound between the A5 and the junction with the A422 Brackley (East). Lane two will be closed. Reason. Road repairs are planned. Status. Pending. Schedule. From 20:00 on 15 August 2016 to 06:00 on 16 August 2016. Schedule. From 20:00 on 17 August 2016 to 06:00 on 18 August 2016. There will be one of two lanes closed.

* Location. The A43 southbound between the junctions with the A5 and the A422 Brackley East. Lane two will be closed. Reason. Road repairs are planned. Status. Pending. Schedule. From 20:00 on 15 August 2016 to 06:00 on 16 August 2016. Schedule. From 20:00 on 17 August 2016 to 06:00 on 18 August 2016. There will be one of two lanes closed.

User Comments

+ Post a Comment

Current Comments (last 30 days)

No Recent Comments.