The diagram below shows live average speeds on the M6.

Jct 21A  61mph
M54 Traffic (M6 Junction 10A)
M69 Traffic (M6 Junction 2)
M56 Traffic (M6 Junction 20)
M62 Traffic (M6 Junction 21A)
M58 Traffic (M6 Junction 26)
M65 Traffic (M6 Junction 29)
M61 Traffic (M6 Junction 30)
M55 Traffic (M6 Junction 32)
A601(M) Traffic (M6 Junction 35)
M42 Traffic (M6 Junction 4)
M42 Traffic (M6 Junction 4A)
M5 Traffic (M6 Junction 8)
M1 Traffic (Joins M6)

M6 Traffic Map - Travelling South


Main M6 Travel News

Clear There are currently no incidents reported on the M6 south.

Current M6 Delays - Slow Moving Traffic

Clear We have no reports of any slow moving traffic on the M6 heading south.

M6 South Average Speed Today

M6 Roadworks

Current Roadworks

* 24hr lane 3 closure both directions for barrier condition survey.

* 24hr lane 3 closure both directions for barrier condition survey.

* Hard shoulder 0700 - 1800 due to VSF repairs

* Hard shoulder 0700 - 1800 due to VSF repairs

* Hard shoulder 0700 - 1800 due to VSF repairs

* 24H - Narrow Lanes & Hard running Northbound and Southbound including slips for signage, cctv and lining prep prior to narrow lane installation.

* 24H - Narrow Lanes & Hard running Northbound and Southbound including slips for signage, cctv and lining prep prior to narrow lane installation.

* 24H - Narrow Lanes & Hard running Northbound and Southbound including slips for signage, cctv and lining prep prior to narrow lane installation.

* 24 hours hard shoulder closure with 50mph system & free recovery plus nightly lane closure

* 24hr hardshoulder closure northbound for grassland works

* 24hr Lane closures with switching Northbound slip road closure Sunday 5th Nov for Carriageway Reconstruction and repair between 2000-0600hrs

* Phased lane closures switching to hard shoulder closures 2000 - 0600 due tolight column replacement

* 24hr Hardshoulder Closure with Lane One and Two then Lane Three and Two Closures for Drainage Works, Resurfacing, Lining and Stud replacement Northbound.

* 24hr Hardshoulder Closure with Lane One and Two then Lane Three and Two Closures for Drainage Works, Resurfacing, Lining and Stud replacement Northbound.

* N - Overnight Total closure of access slip southbound due to A556 Scheme

* N - Overnight Total closure of Exit slip southbound due to A556 Scheme

* 24hr hardshoulder closure northbound for grassland works

* 24hr Hardshoulder Closure with Lane One and Two then Lane Three and Two Closures for Drainage Works, Resurfacing, Lining and Stud replacement Northbound.

* 24hr lane 3 closure for barrier repair works

* Current works have 50mph speed restriction. Works will include carriageway or lane closures

* N - Overnight hard shoulder & lane one closed North & Southbound due to SMART Motorways

* lane 1 closure 2000 to 0600 Installation of CCTV

* Phased lane closures switching to hard shoulder closures 2000 - 0600 due tolight column replacement

* Phased lane closures switching to hard shoulder closures 2000 - 0600 due tolight column replacement

* Phased lane closures switching to hard shoulder closures 2000 - 0600 due tolight column replacement

* Phased lane closures switching to hard shoulder closures 2000 - 0600 due tolight column replacement

* Full carraigeway closure and all associated slip roads 2100 - 0600 due to traffic management, structural repairs, rewaterproofing and resurfacing of bridges.

* Full carraigeway closure and all associated slip roads 2100 - 0600 due to traffic management, structural repairs, rewaterproofing and resurfacing of bridges.

* Current works have 50mph speed restriction east and westbound. Works will include carriageway or lane closures.

* Phased lane closures switching to hard shoulder closures 2000 - 0600 due tolight column replacement

* Full carraigeway closure and all associated slip roads 2100 - 0600 due to traffic management, structural repairs, rewaterproofing and resurfacing of bridges.

* Full slip road closure 2100 - 0600 due to carraigeway repairs

* 24hr Hardshoulder Closure with Lane One and Two then Lane Three and Two Closures for Drainage Works, Resurfacing, Lining and Stud replacement Northbound.

* 24hr Lane closures with switching Northbound slip road closure Sunday 5th Nov for Carriageway Reconstruction and repair between 2000-0600hrs

* N-Nightime Lane One and Two closure East & Westbound for Technical Surveys

* N-Nightime Lane One and Two closure East & Westbound for Technical Surveys

* Full closure from 21:00 till 06:00 for TM installation, maintenance, phase changes, removal. Planing, surfacing, concrete pours, waterproofing, hydro-demolition, civils works

* N - Overnight lane three closed north & southbound due to barrier repairs

* N - Overnight lane three closed north & southbound due to barrier repairs

* 24hr Narrow lanes for TM installation, maintenance, phase changes, removal. Planing, surfacing, concrete pours, waterproofing, hydro-demolition, civils works

* 24H - Hard shoulder closure Southbound for Structure repairs

* 24/7 Hardshoulder closure to protect installed varioguard

* Mobile Hard shoulder closure for litter picking 0930 x 1700hrs

* 24hr Hardshoulder Closure Northbound for Comms works.

* Mobile Hard shoulder closure for litter picking 0930 x 1700hrs

* Mobile Hard shoulder closure for litter picking 0930 x 1700hrs

* Mobile Hard shoulder closure for litter picking 0930 x 1700hrs

* Mobile Hard shoulder closure for litter picking 0930 x 1700hrs

* Mobile Hard shoulder closure for litter picking 0930 x 1700hrs

* Mobile Hard shoulder closure for litter picking 0930 x 1700hrs

* Mobile Hard shoulder closure for litter picking 0930 x 1700hrs

* 24hr narrow lanes 4 METRES WIDTH RESTRICTION with 40mph speed limit, restraint systems, re-waterproofing and bridge deck structural repairs

* Full slip road closure 2100 - 0600 due to carraigeway repairs

* 24H - Hard shoulder closed east & westbound & all slips due to comms

* TYPE : GDP

* 24 hours hard shoulder closure with 50mph system & free recovery plus nightly lane closure

* 24H - Narrow Lanes & Hard running Northbound and Southbound including slips for signage, cctv and lining prep prior to narrow lane installation.

* 24 hours hard shoulder closure with 50mph system & free recovery plus nightly lane closure

* 24h - Hard shoulder closed southbound due to fence repairs

* 24H - Hard Shoulder closed southbound due to safety

* 24H - Hard shoulder closed eastbound due to Safety

* 24hr hardshoulder closure northbound for varioguard installation for barrier damage

* 24/7 Hardshoulder closure to protect installed varioguard

* TYPE : GDP

* 24hr Narrow lanes for TM installation, maintenance, phase changes, removal. Planing, surfacing, concrete pours, waterproofing, hydro-demolition, civils works

* 24 hours hard shoulder closure with 50mph system & free recovery plus nightly lane closure

* TYPE : GDP

* TYPE : GDP

* 24 hours hard shoulder closure with 50mph system & free recovery plus nightly lane closure

* 24H - Hard shoulder closed east & westbound & all slips due to comms

* 24hr hardshoulder closed southbound for bridge damage

* TYPE : GDP

* TYPE : GDP

* Various closures to facilitate the construction of the Heysham to M6 Link road and full reconfiguration of M6 Jct 34

* 24 hours hard shoulder closure with 50mph system & free recovery plus nightly lane closure

* 24H - Hard shoulder closed east & westbound & all slips due to comms

* 24hr lane 3 closure for barrier repair works

* Current works have 50mph speed restriction east and westbound. Works will include carriageway or lane closures.

* Full slip road closures 2100 - 0600 due to carraigeway repairs

* Current works have 50mph speed restriction. Works will include carriageway or lane closures.

* Current works have 50mph speed restriction east and westbound. Works will include carriageway or lane closures.

* N - Overnight Total closure of access slip southbound due to A556 Scheme

* N - Overnight Total closure of access slip southbound due to A556 Scheme

* Full closure from 21:00 till 06:00 for TM installation, maintenance, phase changes, removal. Planing, surfacing, concrete pours, waterproofing, hydro-demolition, civils works

* Full closure from 21:00 till 06:00 for TM installation, maintenance, phase changes, removal. Planing, surfacing, concrete pours, waterproofing, hydro-demolition, civils works

* Current works have 50mph speed restriction east and westbound. Works will include carriageway or lane closures.

* 24hr Narrow lanes for TM installation, maintenance, phase changes, removal. Planing, surfacing, concrete pours, waterproofing, hydro-demolition, civils works

* 24hr Narrow lanes for TM installation, maintenance, phase changes, removal. Planing, surfacing, concrete pours, waterproofing, hydro-demolition, civils works

* Various closures to facilitate the construction of the Heysham to M6 Link road and full reconfiguration of M6 Jct 34

* Reduction to lane 1 or 2 running 2200 to 0600 with 24/7 hardshoulder closure 40mph speed limit and width restrictions carriageway and structure investigations, removal of existing surfacing and waterproofing, concrete repairs to the bridges, replacement of waterproofing , surfacing and vehicle restraint system

* 24 hr narrow lanes and 50 mph speed limit due to replacement of existing parapet

* TYPE : AWP : Location : The M6 southbound between junctions J3 and J2 : Reason : Roadworks are planned : Status : Pending : Schedule : Expect disruption everyday between 08:00 and 18:00 from 3 October 2016 to 7 October 2016 : Schedule : Expect disruption everyday between 08:00 and 18:00 from 10 October 2016 to 14 October 2016 : Schedule : Expect disruption everyday between 08:00 and 18:00 from 17 October 2016 to 21 October 2016 : Schedule : Expect disruption everyday between 08:00 and 18:00 from 24 October 2016 to 28 October 2016 : Schedule : Expect disruption everyday between 08:00 and 18:00 from 31 October 2016 to 1 November 2016

* TYPE : AWP : Location : The M6 southbound entry slip at junction J4 : Lane Closures : Lanes 1 and 2 will be closed : Reason : Roadworks are planned : Status : Pending : Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 October 2016 to 8 October 2016 : Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 October 2016 to 15 October 2016 : Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 October 2016 to 22 October 2016 : Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 October 2016 to 29 October 2016 : Schedule : From 20:00 on 31 October 2016 to 06:00 on 1 November 2016 : Lanes Closed : All lanes will be closed

* TYPE : AWP : Location : The M6 southbound exit slip at junction J4 : Lane Closures : Lanes 1 and 2 will be closed : Reason : Roadworks are planned : Status : Pending : Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 October 2016 to 8 October 2016 : Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 October 2016 to 15 October 2016 : Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 October 2016 to 22 October 2016 : Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 October 2016 to 29 October 2016 : Schedule : From 20:00 on 31 October 2016 to 06:00 on 1 November 2016 : Lanes Closed : All lanes will be closed

* TYPE : AWP : Location : The M6 southbound between junctions J19 and J16 : Lane Closures : Lane one will be closed : Reason : Road repairs are planned : Status : Pending : Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 October 2016 to 30 October 2016 : Lanes Closed : There will be one of three lanes closed

* TYPE : AWP : Location : The M6 southbound exit slip at junction : Lane Closures : Lanes 1 and 2 will be closed : Reason : Road repairs are planned : Status : Pending : Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 October 2016 to 8 October 2016 : Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 October 2016 to 15 October 2016 : Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 October 2016 to 22 October 2016 : Lanes Closed : All lanes will be closed

*

Future Planned Roadworks

* Location. The M6 southbound between junctions J3 and J2. Reason. Roadworks are planned. Status. Pending. Schedule. Expect disruption everyday between 08:00 and 18:00 from 3 October 2016 to 7 October 2016. Schedule. Expect disruption everyday between 08:00 and 18:00 from 10 October 2016 to 14 October 2016. Schedule. Expect disruption everyday between 08:00 and 18:00 from 17 October 2016 to 21 October 2016. Schedule. Expect disruption everyday between 08:00 and 18:00 from 24 October 2016 to 28 October 2016. Schedule. Expect disruption everyday between 08:00 and 18:00 from 31 October 2016 to 1 November 2016.

* Location. The M6 southbound entry slip at junction J4. Lanes 1 and 2 will be closed. Reason. Roadworks are planned. Status. Pending. Schedule. Expect disruption everyday between 20:00 and 06:00 from 3 October 2016 to 8 October 2016. Schedule. Expect disruption everyday between 20:00 and 06:00 from 10 October 2016 to 15 October 2016. Schedule. Expect disruption everyday between 20:00 and 06:00 from 17 October 2016 to 22 October 2016. Schedule. Expect disruption everyday between 20:00 and 06:00 from 24 October 2016 to 29 October 2016. Schedule. From 20:00 on 31 October 2016 to 06:00 on 1 November 2016. All lanes will be closed.

* Location. The M6 southbound exit slip at junction J4. Lanes 1 and 2 will be closed. Reason. Roadworks are planned. Status. Pending. Schedule. Expect disruption everyday between 20:00 and 06:00 from 3 October 2016 to 8 October 2016. Schedule. Expect disruption everyday between 20:00 and 06:00 from 10 October 2016 to 15 October 2016. Schedule. Expect disruption everyday between 20:00 and 06:00 from 17 October 2016 to 22 October 2016. Schedule. Expect disruption everyday between 20:00 and 06:00 from 24 October 2016 to 29 October 2016. Schedule. From 20:00 on 31 October 2016 to 06:00 on 1 November 2016. All lanes will be closed.

* Location. The M6 southbound between junctions J19 and J16. Lane one will be closed. Reason. Road repairs are planned. Status. Pending. Schedule. Expect disruption everyday between 21:00 and 06:00 from 2 October 2016 to 30 October 2016. There will be one of three lanes closed.

* Location. The M6 southbound exit slip at junction . Lanes 1 and 2 will be closed. Reason. Road repairs are planned. Status. Pending. Schedule. Expect disruption everyday between 21:00 and 06:00 from 3 October 2016 to 8 October 2016. Schedule. Expect disruption everyday between 21:00 and 06:00 from 10 October 2016 to 15 October 2016. Schedule. Expect disruption everyday between 21:00 and 06:00 from 17 October 2016 to 22 October 2016. All lanes will be closed.

User Comments

+ Post a Comment

Current Comments (last 30 days)

No Recent Comments.