M27 Traffic Report - Heading East

M27
 
East

This Report: 30/09/2016 04:13:37

Frixo Traffic Updated: 30/09/2016 04:04:02

Road Search

Road Diagram

The diagram below shows live average speeds on the M27.

Jct 1  76mph
Jct 3  72mph
Jct 4  75mph
Jct 5  30mph
Jct 7  70mph
Jct 8  48mph
Jct 9  50mph
Jct 11  53mph
Jct 12  65mph
M275 Traffic (M27 Junction 12)
M271 Traffic (M27 Junction 3)
M3 Traffic (M27 Junction 4)

M27 Traffic Map - Travelling East


Main M27 Travel News

Clear There are currently no incidents reported on the M27 east.

Current M27 Delays - Slow Moving Traffic

* Slow traffic M27 J5 eastbound exit [30mph]

M27 East Average Speed Today

M27 Roadworks

Current Roadworks

* Location. The M27 eastbound between junctions J9 and J11. The hard shoulder and lane 1 are closed. Reason. Roadside Equipment Maintenance. Status. Period. From 22:01 on 28 September 2016 to 06:00 on 4 October 2016. There is one of three lanes closed.

* Location. The M27 eastbound entry slip at junction J7. Reason. Roadside Drains Works. Status. Period. Expect disruption until 06:00 on 29 September 2016. All lanes are closed.

* Location. The M27 eastbound at junction J7. The hard shoulder, lanes 1 and 2 are closed. Reason. Roadside Drains Works. Status. Period. From 21:01 on 28 September 2016 to 06:00 on 30 September 2016. There are two of three lanes closed.

* Location. The M27 eastbound between junctions J7 and J8. The hard shoulder, lanes 1 and 2 are closed. Reason. Roadside Drains Works. Status. Period. From 21:01 on 28 September 2016 to 06:00 on 30 September 2016. There are two of four lanes closed.

* Location. The M27 eastbound between junctions J8 and J9. The hard shoulder, lanes 1 and 2 are closed. Reason. Roadside Drains Works. Status. Period. From 21:01 on 28 September 2016 to 06:00 on 30 September 2016. There are two of three lanes closed.

* Location. The M27 eastbound exit slip at junction J8. Lanes 1 and 2 are closed. Reason. Roadside Drains Works. Status. Period. Expect disruption until 06:00 on 29 September 2016. All lanes are closed.

* Location. The M27 eastbound entry slip at junction J8. Reason. Roadside Drains Works. Status. Period. Expect disruption until 06:00 on 29 September 2016. All lanes are closed.

* Location. The M27 eastbound entry slip at junction J10. Reason. Road repairs. Status. Period. Expect disruption until 06:00 on 30 September 2016. All lanes are closed.

Future Planned Roadworks

Clear No Future M27 Roadworks Planned.

User Comments

+ Post a Comment

Current Comments (last 30 days)

No Recent Comments.